Author Archives: Doug
New doors on the little barn
Here are the new (bi-fold) doors I made.
A reminder of how the Little Barn looked in 2010
This is how the little barn looked originally when we were laying the water pipe. 10th March 2010
Nearly gone (the Little Barn roof)
Raise the roof! Starting work on the Linhay (Garage)
At last we get started on re-modelling the Linhay by raising the roof to accomodate the bats.
All systems go!
Finally, after Doug living in France for 8 months and Rachel working in London for 16 months and lots of planning and building regulations drawings we finally got there. The Building Control Inspector came today and … we have now … Continue reading
Building Regs Approval – has come through!
Brilliant, after lots of hard work by Dan Lethbridge he submitted the drawings and today received notice of approval. The only thing missing now are Dave’s structural engineering calculations and then we can call the building inspector.
Digby gets new boots
Yes poor Digby has lost some teeth from his tracks and needs new ones. Although only one track was affected we decided to replace both.
Batman cometh
David the batman came today. After poking around he noticed that the first floor timber floor boards had been removed. This was done by the previous owners, we guess, to stop rot and to avoid accidents of people falling through … Continue reading